Towers Project

Public Power Company
Tower for the PPC in
Ptolemaida

Public Power Company <br> Tower for the PPC in <br> Ptolemaida 1
  • Tower H=106.00 m
  • The construction was made without the use of extra crane
  • On the sliding type was mounted the crane arm that was climbing along with the shuttering