![Tower for the 5th Unit of <br> Ptolemaida Public Power <br> Company 2](https://evox-slipform.com/media/pages/projects/slipform-towers-5th-ptolemaida/3019c78b42-1661426091/top-full-1.jpeg)
Construction of 2 towers, 143,50m high and 12,80x12,8 m floor plans with internal partitions at the 5th PPC unit in Ptolemaida.
There was a climbing ladder and a lift for the staff. At the lower 40.00 meters the towers would be connected to the building that would be built afterwards.
A special slipform shuttering was made so that horizontal reinforcements protruding from the slipform shuttering were placed in the slide without bending.
During sliding, a special membrane was also placed on the outer surface to create a rough joint surface.
Top view of night work
![Tower for the 5th Unit of <br> Ptolemaida Public Power <br> Company 3](https://evox-slipform.com/media/pages/projects/slipform-towers-5th-ptolemaida/14f280d563-1661426091/bottom-full-1.jpeg)
Inside, A-type yokes were placed to facilitate the movement of the crane conveyor. Perpendicularly placed type B yokes with perimeter raised floor outside.