A 5-ton winch is mounted on the sliding type for lifting concrete and iron reinforcement.
As can be seen in the above photos, the sliding press has three levels of work:
- The main working floor where concrete is laid and the horizontal reinforcement is installed
- The elevated working floor for the installation of vertical reinforcements
- The underlying working floor under the slipform shuttering, to form the surface of the concrete if required
The outside surface is covered with a safety net.